This $7.2 million project for BNSF Railway Company consisted of constructing a new structural steel bridge over Turkey Creek, along with channel walls founded on drilled shafts. Clarkson also constructed a new embankment for two mainline tracks. An eight hour window for cut-over to the existing tracks was required by the owner. This project also had drainage structures (RCB and RCP), retaining wall, handrail, temporary shoring, clearing and demolition of the existing railroad bridge.