This project in C7娱乐官方入口 City, Missouri, realigned and widened Red Bridge Road from Holmes Road to Blue River Road. The improvement included a new bridge spanning the Union Pacific Railroad and the Blue River. Over 115,000 cubic yards of borrow from off-site sources was required for this one-mile project. The project was constructed in phases to maintain traffic flow in both directions for the duration of construction. New sanitary sewers, water mains, storm sewers, asphalt paving, curb and gutter, street lighting and traffic signals were installed throughout the length of the project.
Clarkson Construction was the self-performing general contractor for this $12 million project.